November 16,2023
Enterprise Name
The sealant has very strong adhesion and performs well even on glass and aluminum. After curing, it remains flexible and shows no cracking. Perfect for our facade projects.
Nov 23, 2026
To apply silicone sealant, clean and dry the joint, fit the correct backing, mask the edges, and fill the joint in one steady pass. Tool the bead before a skin forms. With fire rated silicone sealant for joints, follow one extra rule: copy the tested assembly exactly. Match the joint width, depth, backing, and substrate to the listed detail, and read the data sheet for primer and cure needs. Then let the sealant cure and inspect the bead for voids. I use this order on every job, because one small shortcut can break a fire rating.
Name the joint first. The floor-to-wall link, the curtain wall border, the door or window gap, and the concrete building joint should all be used in different ways. A slab's joint might only move a little. The face of a building can move every day because of wind and heat. Before I place my order, I mark each type of joint as I walk around the site with the plans in my hand. It is important to do this step because tested joint systems, such as those in UL 2079 or ASTM E1966, can only work with certain kinds of joints. If something works somewhere, it might not work somewhere else.
Joint width and depth should be measured many times. Joints vary in size. Near the bottom, a 15-mm gap might be 25 mm wide. Record the back's breadth, length, and space. Ask the builder how much heat, settlement, or shaking may move it. Sealant recommendations like ASTM C1193, recommend a width-to-depth ratio of 2:1 for many moving joints. One firestop detail discussed defies that rule. Each schedule number should be readable by the crew and inspector.
Look around the joint. Sunlight, rain, cleaning agents, and surface heat may affect sealant performance. After that, examine the code aim. For fire-resistant system joints, Part 715 of the International Building Code requires nonflammable materials. Joint tests should be ASTM E1966 or UL 2079. Edges of curtain walls should be ASTM E2307. Check the hourly rate and smoke/air leak restrictions. Ask whether the local authority wants a third-party listing. Setting these criteria before buying saves time and effort. To get a suitable price, inform the provider of your needs.
Safety is not guarantyd with regular or high-temperature silicone. Some treated beads include heat-use labels. An assembly's fire grade indicates its performance in a typical fire test. Those claims disagree. Fire-resistance periods are only granted to tested joint systems with backing, depth, and substrate lists. I never rely on a product's name. I need the test report that covers my job's build-up. I consider it a basic coating that can be used for anything if the merchant can't relate it to a tested item.
Joint systems employ rubber and firestop plastic, although they perform differently. Water-based acrylic paint is utilised in low-traffic areas inside. Our fire rated silicone sealant for joints resists weather and UV radiation and remains flexible. Joints that move with temperature perform nicely too. Acrylic may be used on dry hallway walls. Silicone handles edges better. See whether the item can be relocated on the listing and product info sheet. Price, location, and movement should be considered. A broken joint costs more than sealant.
Our Jiaobao fire-rated silicone joint sealer is a single-piece acidic RTV paste. It comes in 300 and 600 ml sausage or cartridge packs. You may select white, black, grey, or another colour. It lasts a year. We know its density is 1.40 ± 0.05 g/cm³ and 99.5% is non-volatile. The -50°C to +150°C temperature range is for usage, not fire. It fills through-holes, building joints, and door-window gaps. I test it first on a metal or alkaline surface since it dries with acetic acid. Ask us for your setup papers.
Clean your faces before sticking together. Remove old sealant, dust, thin film, grease, curing chemicals, and loose particles. Smooth the concrete using a wire brush or grinder. Clean up dust. Wipe metal with a clean towel. Change the cloth occasionally to prevent spreading filth. See what cleansers are safe on the data sheet. Fix damaged or chipped edges before sealing. Because moving the object will remove a weak edge. Allow all surfaces to dry. Wet or cold beads may weaken the binding and create a hole only the most observant can perceive.
Put on the backing as instructed by the tested system. Many joint systems on this list need squashed and packed mineral wool. Plastic backer rod melts and burns, therefore don't use it in a fire-rated joint unless the label indicates so. Push mineral wool all the way into the hole after cutting it wider. Use a marked probe to measure depth. Bond-breaker tape may make sealant cling to two surfaces and grow. Don't use a flammable or banned filler to save time.
Use each base to observe how it clings and works with others before constructing more. Mix acid-cure silicone with surrounding sealants, coatings, adhesives, and insulation to avoid bonding issues. Pull off a firm chunk by hand. The sealer should tear before peeling. This makes the adhesive excellent. ASTM C794 describes a formal peel test and site inspection. Prepare your tools. You'll need a caulking gun or sausage-pack gun, clean cloths, gloves, eye protection, and airflow. Keep the air flowing because acid-cured silicone smells like vinegar.
Check the cartridge junction for fire-test detail before cutting. The back, surfaces, glue thickness, joint breadth, and depth must match. Examine the packaging, batch number, expiration date, and storage time. We can store our items for a year, so I check the packaging dates. For straight lines and edge protection, masking tape should be applied on all four sides. If the data sheet says so, prime the bonded sides thinly and evenly. Then wait the flash time. After not priming rough or porous surfaces, peel-back commonly occurs.
Take a 45-degree cut in the nozzle for our fire rated silicone sealant for joints so that it is just a bit smaller than the joint width. Put the sealer in front of the nozzle and press the tip against the back of the nozzle. The sealant will be pushed into the corners and out of the way. Press down and move slowly so the bead doesn't stop. It's possible for air to get stuck and leave thin spots in the middle of a joint if you stop and start. To make a 600 ml sausage pack, put it in a sausage gun and clean the end. Fill the whole area with the right thickness, making sure there are no cracks, holes, or thin spots.
When you fill the bead, work it right away because the skin forms quickly. Data we have shows that surfaces dry in 45 to 60 minutes when the temperature is 25°C and the humidity is 50%. So I work on them right away and never wait. The sealer will be packed against both sides and have a smooth shape after a light press with the spatula. Take off the masking tape slowly, before a skin forms. Then, check the whole length for holes, gaps, or thin spots. If you find any, fix them right away. For your handover file, take a picture of the finished joint and the tag that shows where it is.
It takes a while for the fix to work, and each step is unique. Skin forms when the surface stops moving. The time when the surface doesn't stick is called tack-free time. The time when the whole depth turns into rubber is called through-curing. A one-part silicone cures from the outside in with water from the air. Our item gets harder at a rate of about 3 mm every 24 hours when it is 25°C and 50% relative humidity. So, a joint that is 12 mm deep needs four days to heal. If it's cold, dry, or there isn't enough air flow, it may move more slowly. That's when you should plan to check things out.
See the data sheet and use and service temperatures within ranges. Don't contact cold, hot, wet, or condensation-covered surfaces unless the maker says so. When steel heats in the sun, sealant might dry too rapidly and bubble. However, a chilly, wet morning might impede the binding. If working outside, keep the joint dry and shade it. Protect fresh outer joints against rain, dust, hits, and moving feet when wet. After drying, our sealant may be utilised from -50°C to +150°C. You can still melt it in a fire.
Joints move. It is hot, so slabs and walls get bigger and buildings sink. Vibrations or earthquakes make things move even more. Smoke can get through a fire seal that breaks after a few years. One of the tests in UL 2079 moves the joint around before it is put on fire. After some time has passed, this test checks the seal again. As a result, only two faces of any fire rated silicone sealant for joints should be used to connect parts in your mentioned system. Our sealer forms a bendable seal. Before you choose a standard, I suggest that you ask us for an analysis of how your joint moves.
Every time I see someone fail, it's always because of the same few mistakes. Crews either use regular silicone in a rated joint or the wrong backing, or they don't pay attention to the depth that was given. Some people don't clean the joint, leave spaces between the beads, or let rain and traffic hit the joint before it's fully set. Some teams use old gear even though the pack looks fine. Because of each mistake, the field joint and the tested unit don't match. Most of these issues can be fixed quickly and cheaply with a short list of things to do before applying and the signature of a supervisor on the first 30 feet.
Procurement teams should request current business and product-specific materials. Request the technical data sheet, safety data sheet, installation instructions, and test or listing reports for your set. Verify that the reports reflect your backing, substrates, sizes, movement grade, and fire immunity time. Make sure the local government agrees with the report sender. Your build-up may fail if your certificate shows a different product grade or joint size. We're pleased to provide ISO and CE certification information for Jiaobao goods. Discuss test orders with your fire artist.
A good provider does more than just ship refills. You should look for batch information that can be tracked, help from experts, accessories that work with the product, and clear instructions for quality control when the product is handed over. Check the lead time, because if the sealant delivery is held up, a crew might not have anything to do. Jiaobao has been around since 2013 and takes one to two weeks to make something.
They ship by sea or land, do OEM/ODM customization, which includes unique colors, and will refund or replace if there are quality issues during the shelf life. With 300 ml and 600 ml packs that come in drum or sausage shapes, you can match the length of the pack to the joint and waste less. Don't just look at unit price when picking a partner; also look at these terms.
Start with the portion if you wish to use our fire rated silicone sealant for joints. Next, I compare breadth, depth, movement, and exposure to an ASTM E1966 or UL 2079-tested joint system. Silicone and firestop acrylic function better in varied temperature and movement circumstances. Clean faces, an acceptable backing, prep work where required, one continuous fill, and the proper equipment at the correct time keep glue in place. If it cures long, becomes heated, and moves a lot, the seal may fail. Matching papers, tracking batches, and seller assistance end the process and reduce the risk of failing checks and doing further labour.
No, unless a tried-and-true method proves it. If the product doesn't have a fire-resistance time by itself, make sure it fits the allowed joint detail. You should get a report from the service provider that goes over your setup.
Rubber doesn't let paint stick very well, and paint can break when the joint moves. Get the color you need instead. On Jiaobao, you can pick from white, black, gray, and your own colors.
That's what the proven method says to use most of the time. Some types of polyethylene backer rod melt in fires, so they shouldn't be used in most rated joints.
To get milliliters per meter, increase the amount of space between the sides by 1,000. Two 20 mm by 10 mm joints need 200 ml each, so a 600 ml sausage pack will last for three meters. For waste, 10.5% to 15% should be added.
Looking for a company that sells fire rated silicone sealant for joints? Jiaobao has been making rubber covers since 2013 and has ISO and CE approval. It takes us one to two weeks to make something, and we offer OEM/ODM service. You can get your money back or a new one if there are any quality issues during the shelf life. If you want to know more, you can email dorashen@cnjiaobao.com with your joint sizes and document needs, or go to shandongjiaobao.com.
1. ASTM International, Standard Test Method for Fire-Resistive Joint Systems (ASTM E1966), 2015
2. Underwriters Laboratories, Tests for Fire Resistance of Building Joint Systems (UL 2079), 2004
3. International Code Council, International Building Code, 2021
4. ASTM International, Standard Guide for Use of Joint Sealants (ASTM C1193), 2016
5. ASTM International, Standard Test Method for Adhesion-in-Peel of Elastomeric Joint Sealants (ASTM C794), 2018
6. ASTM International, Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems (ASTM E2307), 2020
November 16,2023
Enterprise Name
The sealant has very strong adhesion and performs well even on glass and aluminum. After curing, it remains flexible and shows no cracking. Perfect for our facade projects.
November 16,2023
Enterprise Name
Stable quality across batches. Our customers especially like the smooth application and consistent extrusion. It helps reduce installation time on site.
November 16,2023
Enterprise Name
I used it for bathroom sealing. Excellent waterproof performance and no mold issues so far. It's been holding up very well in humid conditions.
November 16,2023
Enterprise Name
The neutral silicone works well on sensitive materials without corrosion. Very suitable for industrial applications requiring stable performance.